Vole au vent
Wind turbine installation vessel operated by Jan De Nul. IMO 9655315.

Where it is now
Last seen on AIS on 1 Oct 2026: jacked up at Dieppe Le Tréport. See it on the live map.
Offshore wind projects
- Saint-Nazaire Offshore Wind Farm · 2022
Transport and installation of 80 GE Haliade 150-6 MW turbines.
Source: offshore-mag.com - Dieppe-Le Tréport Offshore Wind Farm · 2024–2025
Turbine installation (62 turbines, 496 MW).
Source: bairdmaritime.com - Îles d'Yeu et de Noirmoutier Offshore Wind Farm · 2025
Installed all 61 turbines (500 MW); offshore works from May 2025.
Source: jandenul.com
Detections in the last 30 days
- 4 Sept 2026VOLE AU VENT jacked up at Dieppe Le Tréport
AIS placed VOLE AU VENT (WTIV) at Dieppe Le Tréport for about 630 hours. A jack-up of this length is consistent with a foundation or component-exchange campaign.