Wind Osprey

Wind turbine installation vessel operated by Cadeler. IMO 9621704.

Wind Osprey installing a turbine at an offshore wind farm
Image: Cadeler

Where it is now

Not seen on AIS in the tracked North Sea and Baltic area in the last six hours. See it on the live map.

Offshore wind projects

  • Seagreen Offshore Wind Farm · 2021–2022

    Installed first turbine (Dec 2021), then handed over to Wind Orca April 2022.

    Client: SSE Renewables / TotalEnergies.

    Source: offshorewind.biz
  • Hollandse Kust Zuid Offshore Wind Farm · 2022

    Turbine transport and installation (Siemens Gamesa SG 11 MW).

    Client: Vattenfall.

    Source: offshorewind.biz
  • Hollandse Kust Noord Offshore Wind Farm · 2023

    T&I of 42x Siemens Gamesa SG 11 MW turbines.

    Client: CrossWind (Shell / Eneco).

    Source: offshorewind.biz
  • Baltic Power Offshore Wind Farm · 2025

    T&I of all 76x Vestas V236-15.0 MW turbines from Port of Ronne (Bornholm); first turbine July 2025.

    Client: Baltic Power (PKN Orlen / Northland Power).

    Source: cadeler.com, offshorewind.biz
  • East Anglia THREE Offshore Wind Farm · Since 2026

    Installed the first turbine (21 April 2026), running in parallel with Wind Pace; full T&I of 95 Siemens Gamesa turbines.

    Client: ScottishPower Renewables.

    Source: cadeler.com, offshorewind.biz

Announced contracts and orders

  • charter award with Baltic Power (PKN Orlen / Northland Power) for Baltic Power Offshore Wind Farm · announced 2023

    T&I of 76 Vestas V236-15.0 MW turbines, Polish Baltic Sea; value stated as EUR 68-85 million.

    Source: offshorewind.biz
  • charter award with ScottishPower Renewables for East Anglia THREE Offshore Wind Farm · announced 2023-03-29

    T&I of 95 wind turbines (1.4 GW), southern North Sea; scope shared with one P-class newbuild; value stated as just above EUR 100 million; work early 2026 to end 2026.

    Source: cadeler.com
  • charter award with Orsted for Hornsea 3 Offshore Wind Farm · announced 2023-04

    Part of Cadeler's two-contract Hornsea 3 award (April 2023): installation of half the turbine array; combined foundation + turbine value classed EUR 500-700 million.

    Source: offshorewind.biz

Detections in the last 30 days

No detections for Wind Osprey in the last 30 days. A vessel working outside the tracked area, or sailing between jobs, produces none.