Hornsea Two

Offshore wind farm, United Kingdom.

A Hornsea 2 wind turbine nacelle seen from above
Image: Ørsted

Tracked vessels on the farm now

No tracked vessel is on Hornsea Two right now.

From the last three-hourly map update. Open the live map.

Vessels that built and serve it

  • Esvagt Robert Boyle · SOV · ESVAGT

    Since 2025: O&M accommodation and technician transfer, operating out of Orsted's East Coast Hub (Grimsby). Source: bairdmaritime.com

    2021, contract: Newbuild SOV, 10-year contract; world-first e-methanol-powered SOV. Source: maritime-executive.com, bairdmaritime.com

  • Arabella Jane · CTV · Tidal Transit

    Since 2024: CTV - crew transfer. Source: offshore-mag.com

  • Wind of Hope · SOV · Louis Dreyfus Armateurs (LDA)

    Since 2021: O&M accommodation and technician transfer. Source: offshorewind.biz

    2019, contract: SOV, long-term O&M from delivery. Source: offshorewind.biz

  • MHO Asgard · CTV · MHO-Co

    Since 2021: CTV - crew transfer. Source: bairdmaritime.com

    2021, contract: CTV charter (hybrid CTV pair MHO Apollo + MHO Asgard). Source: bairdmaritime.com

  • MHO Apollo · CTV · MHO-Co

    Since 2021: CTV - crew transfer. Source: bairdmaritime.com

    2021, contract: CTV charter (hybrid CTV pair MHO Apollo + MHO Asgard). Source: bairdmaritime.com

  • Wind Orca · WTIV · Cadeler

    2021: Monopile foundation installation (from Feb 2021, alongside DEME's Innovation), 165 monopiles total. Source: oedigital.com, offshorewind.biz

  • Innovation · WTIV · DEME

    2021: Monopile foundation installation (alongside Cadeler's Pacific Orca). Source: offshorewind.biz

  • Sea Installer · WTIV · DEME

    WTIV turbine installation. Source: deme-group.com

  • NKT Victoria · CLV · NKT

    Power cable installation. Source: power-technology.com

  • Energizer · CTV · Northern Offshore Services

    CTV crew transfer / construction support (charterer Orsted), based Port of Grimsby. Source: n-o-s.eu

Detections in the last 30 days